Item Details

Print View

Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former Bethlehem Steel Plant Brownfield Site in Lackawanna, New York: A Study Prepared in Partnership With the Environmental Protection Agency for the RE-Powering America's Land Initiative, Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

James Salasovich [and three others]
Format
EBook; Book; Government Document; Online
Published
Golden, CO : National Renewable Energy Laboratory, 2013.
Language
English
Variant Title
Study prepared in partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative, siting renewable energy on potentially contaminated land and mine sites
Series
NREL/TP
SuDoc Number
E 9.16:NREL/TP-7 A 40-58194
Description
1 online resource (x, 82 pages) : color illustrations, color map.
Notes
  • Title from title screen (viewed Nov. 25, 2013).
  • "April 2013."
  • Includes bibliographical references.
Series Statement
NREL/TP ; 7A40-58194
Copyright Not EvaluatedCopyright Not Evaluated
Technical Details
  • Access in Virgo Classic
  • Staff View

    LEADER 02311nam a2200457 i 4500
    001 u6190571
    003 SIRSI
    005 20131216131509.0
    006 m o d f
    007 cr mn|||||||||
    008 131216s2013 couab ob f000 0 eng c
    035
      
      
    a| (OCoLC)865476198
    040
      
      
    a| GPO b| eng e| rda e| pn c| GPO d| MvI
    042
      
      
    a| pcc
    043
      
      
    a| n-us-ny
    049
      
      
    a| VA@@
    074
      
      
    a| 0430-P-03 (online)
    086
    0
      
    a| E 9.16:NREL/TP-7 A 40-58194
    100
    1
      
    a| Salasovich, James, e| author.
    245
    1
    0
    a| Feasibility study of economics and performance of solar photovoltaics at the former Bethlehem Steel Plant brownfield site in Lackawanna, New York : b| a study prepared in partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative, siting renewable energy on potentially contaminated land and mine sites / c| James Salasovich [and three others].
    246
    3
    0
    a| Study prepared in partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative, siting renewable energy on potentially contaminated land and mine sites
    264
      
    1
    a| Golden, CO : b| National Renewable Energy Laboratory, c| 2013.
    300
      
      
    a| 1 online resource (x, 82 pages) : b| color illustrations, color map.
    336
      
      
    a| text 2| rdacontent
    337
      
      
    a| computer 2| rdamedia
    338
      
      
    a| online resource 2| rdacarrier
    490
    1
      
    a| NREL/TP ; v| 7A40-58194
    500
      
      
    a| Title from title screen (viewed Nov. 25, 2013).
    500
      
      
    a| "April 2013."
    504
      
      
    a| Includes bibliographical references.
    536
      
      
    a| Produced under direction of the Environmental Protection Agency (EPA) by the National Renewable Energy Laboratory (NREL) under Interagency Agreement IAG-08-0719 b| DE-AC36-08GO28308 g| WFD3.1001
    650
      
    0
    a| Photovoltaic power systems z| New York (State) z| Lackawanna x| Planning.
    650
      
    0
    a| Brownfields z| New York (State) z| Lackawanna.
    710
    2
      
    a| National Renewable Energy Laboratory (U.S.), e| issuing body.
    710
    1
      
    a| United States. b| Environmental Protection Agency, e| sponsoring body.
    830
      
    0
    a| NREL/TP ; v| 7 A 40-58194.
    856
    4
    0
    u| http://purl.fdlp.gov/GPO/gpo41685
    596
      
      
    a| 1
    999
      
      
    a| E 9.16:NREL/TP-7 A 40-58194 w| SUDOC i| 6190571-1001 l| INTERNET m| UVA-LIB t| INTERNET
▾See more
▴See less

Availability

Google Preview

Google Books Preview

Read Online