Item Details

Summary of Chariton Valley Switchgrass Co-Fire Testing at the Ottumwa Generating Station in Chillicothe, Iowa [electronic resource]: Milestone Completion Report

W. Amos
Format
EBook; Book; Government Document; Online
Published
Golden, Colo. : National Renewable Energy Laboratory, [2002]
Language
English
Series
NREL/TP
SuDoc Number
E 9.16:NREL/TP-510-32424
Description
iv, 32 p. : digital, PDF file.
Mode of access: Internet from the NREL web site. Address as of 1/11/08: http://www.nrel.gov/docs/fy02osti/32424.pdf ; current access available via PURL.
Notes
  • Title from title screen (viewed on Jan. 11, 2008).
  • "Prepared for the U.S. Department of Energy's Biomass Power Program and the Chariton Valley Biomass Project."
  • "July 2002."
Reproduction Notes
Electronic reproduction. Golden, CO : National Renewable Energy Laboratory, 2002. Mode of access: World Wide Web. System requirements: Adobe Acrobat Reader.
Series Statement
NREL/TP ; 510-32424
Logo for Copyright Not EvaluatedCopyright Not Evaluated
Technical Details
  • Access in Virgo Classic

  • LEADER 02185nam a2200457Ia 4500
    001 u4691273
    003 SIRSI
    005 20080111084832.0
    006 m d f
    007 cr mnu||||||||
    008 030828s2002 coua st f000 0 eng d
    035
      
      
    a| (OCoLC)52935139
    040
      
      
    a| IWA c| IWA d| OCLCQ d| GPO d| MvI
    043
      
      
    a| n-us-ia
    074
      
      
    a| 0430-P-03 (online)
    086
    0
      
    a| E 9.16:NREL/TP-510-32424
    100
    1
      
    a| Amos, Wade A.
    245
    1
    0
    a| Summary of Chariton Valley switchgrass co-fire testing at the Ottumwa Generating Station in Chillicothe, Iowa h| [electronic resource] : b| milestone completion report / c| W. Amos.
    260
      
      
    a| Golden, Colo. : b| National Renewable Energy Laboratory, c| [2002]
    300
      
      
    a| iv, 32 p. : b| digital, PDF file.
    440
      
    0
    a| NREL/TP ; v| 510-32424
    538
      
      
    a| Mode of access: Internet from the NREL web site. Address as of 1/11/08: http://www.nrel.gov/docs/fy02osti/32424.pdf ; current access available via PURL.
    513
      
      
    a| Milestone report.
    500
      
      
    a| Title from title screen (viewed on Jan. 11, 2008).
    500
      
      
    a| "Prepared for the U.S. Department of Energy's Biomass Power Program and the Chariton Valley Biomass Project."
    500
      
      
    a| "July 2002."
    533
      
      
    a| Electronic reproduction. b| Golden, CO : c| National Renewable Energy Laboratory, d| 2002. n| Mode of access: World Wide Web. n| System requirements: Adobe Acrobat Reader.
    536
      
      
    b| DE-AC36-99-GO10337 g| BP01.1026
    650
      
    0
    a| Electric power-plants z| Iowa x| Fuel x| Testing.
    650
      
    0
    a| Biomass energy z| Iowa.
    650
      
    0
    a| Energy crops z| Iowa.
    650
      
    0
    a| Renewable energy sources z| Iowa.
    776
    0
      
    a| Amos, Wade A. t| Summary of Chariton Valley switchgrass co-fire testing at the Ottumwa Generating Station in Chillicothe, Iowa h| iv, 32 p. w| (OCoLC)50815337
    710
    2
      
    a| National Renewable Energy Laboratory (U.S.)
    710
    1
      
    a| United States. b| Department of Energy. b| Biomass Power Program.
    710
    2
      
    a| Chariton Valley Biomass Project.
    856
    4
    0
    u| http://purl.access.gpo.gov/GPO/LPS89342
    596
      
      
    a| 1
    999
      
      
    a| E 9.16:NREL/TP-510-32424 w| SUDOC i| 4691273-1001 l| INTERNET m| UVA-LIB t| INTERNET

Availability

Google Preview

Read Online