Item Details

Print View

Bonneville Power Administration [electronic resource]: Better Management of BPA's Obligation to Provide Power Is Needed to Control Future Costs : Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives

United States. General Accounting Office; United States Bonneville Power Administration; United States Congress House Committee on Appropriations Subcommittee on Energy and Water Development
Format
EBook; Book; Government Document; Online
Published
[Washington, D.C.] : U.S. General Accounting Office, [2004]
Language
English
Variant Title
Better management of BPA's obligation to provide power is needed to control future costs
SuDoc Number
GA 1.13:GAO-04-694
Related Resources
Abstract
Description
Mode of access: Internet from GAO web site. Address as of 8/11/04: http://www.gao.gov/new.items/d04694.pdf; current access available via PURL.
Notes
  • Title from title screen (viewed on Aug. 11, 2004).
  • "July 2004."
  • Paper version available from: U.S. General Accounting Office, 441 G St., NW, Rm. LM, Washington, D.C. 20548.
  • "GAO-04-694."
  • Includes bibliographical references.
Copyright Not EvaluatedCopyright Not Evaluated
Technical Details
  • Access in Virgo Classic
  • Staff View

    LEADER 02346nam a2200457 a 4500
    001 u4154451
    003 SIRSI
    005 20040928150913.0
    006 m d f
    007 cr mn-
    008 040811s2004 dcuab s f000 0 eng c
    035
      
      
    a| (Sirsi) ocm56134406
    035
      
      
    a| (OCoLC)56134406
    037
      
      
    b| GAO (202)512-6000 (voice); (202)512-6061 (Fax); (202)512-2537 (TDD) f| paper copy
    040
      
      
    a| BVA c| BVA d| GPO d| DLC d| MvI
    043
      
      
    a| n-usp--
    074
      
      
    a| 0546-D (online)
    088
      
      
    a| GAO-04-694
    086
    0
      
    a| GA 1.13:GAO-04-694
    110
    1
      
    a| United States. b| General Accounting Office.
    245
    1
    0
    a| Bonneville Power Administration h| [electronic resource] : b| better management of BPA's obligation to provide power is needed to control future costs : report to the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives.
    246
    3
    0
    a| Better management of BPA's obligation to provide power is needed to control future costs
    260
      
      
    a| [Washington, D.C.] : b| U.S. General Accounting Office, c| [2004]
    538
      
      
    a| Mode of access: Internet from GAO web site. Address as of 8/11/04: http://www.gao.gov/new.items/d04694.pdf; current access available via PURL.
    500
      
      
    a| Title from title screen (viewed on Aug. 11, 2004).
    500
      
      
    a| "July 2004."
    500
      
      
    a| Paper version available from: U.S. General Accounting Office, 441 G St., NW, Rm. LM, Washington, D.C. 20548.
    504
      
      
    a| Includes bibliographical references.
    500
      
      
    a| "GAO-04-694."
    596
      
      
    a| 1
    610
    1
    0
    a| United States. b| Bonneville Power Administration x| Appropriations and expenditures.
    610
    1
    0
    a| United States. b| Bonneville Power Administration x| Management.
    650
      
    0
    a| Electric utilities z| Northwest, Pacific x| Cost control.
    710
    1
      
    a| United States. b| Bonneville Power Administration.
    710
    1
      
    a| United States. b| Congress. b| House. b| Committee on Appropriations. b| Subcommittee on Energy and Water Development.
    856
    4
    0
    u| http://purl.access.gpo.gov/GPO/LPS53896
    856
    4
      
    3| Highlights u| http://www.gao.gov/highlights/d04694high.pdf
    856
    4
    2
    3| Abstract u| http://www.gao.gov/docdblite/summary.php?recflag=&accno=A10872&rptno=GAO-04-694
    999
      
      
    a| GA 1.13:GAO-04-694 w| SUDOC i| 4154451-1001 l| INTERNET m| UVA-LIB t| INTERNET
▾See more
▴See less

Availability

Google Preview

Google Books Preview

Read Online