Evaluation of the Late Merge Work Zone Traffic Control Strategy

Andrew G. Beacher, Michael D. Fontaine, Nicholas J. Garber
Format
EBook; Book; Government Document; Online
Published
Charlottesville, Va. : Virginia Transportation Research Council, 2004.
Language
English
Series
VTRC
VTRC (Series)
Abstract
Several alternative lane merge strategies have been proposed in recent years to process vehicles through work zone lane closures more safely and efficiently. Among these is the late merge. With the late merge, drivers are instructed to use all lanes to the merge point and then take turns proceeding through the work zone. Its efficiency has been tested on only a limited basis. The purpose of this project was to determine when, if at all, deployment of the late merge was beneficial. The late merge concept was evaluated by comparing it to the traditional merge using computer simulations and field evaluations. Computer simulations included analysis of 2-to-1, 3-to-1, and 3-to-2 lane closure configurations to determine its impact on throughput and the impact of factors such as free flow speed, demand volume, and percentage of heavy vehicles. Field tests were limited to 2-to-1 lane closures, as recommended by state transportation officials, and examined the impact of treatment type on vehicle throughput, percentage of vehicles in the closed lane, and time in queue. Results of the computer simulations showed the late merge produced a statistically significant increase in throughput volume for only the 3-to-1-lane closure configuration and was beneficial across all factors for this type of closure. For the 2-to-1 and 3-to-2 lane closure configurations, the late merge increased throughput when the percentage of heavy vehicles was large. Field tests showed similar trends with regard to throughput. Although throughput increased, the increase was not statistically significant because of the limited number of heavy vehicles at the site. More drivers were in the closed lane, indicating a response to the late merge signs. Time in queue was also reduced, although the reductions were not statistically significant. The authors conclude that the late merge should be considered for 3-to-1 lane closure configurations but not until a sound methodology for deployment has been developed and tested in the field. For the 2-to-1 and 3-to-2 configurations, the late merge should be implemented only when the percentage of heavy vehicles is at least 20 percent.
Description
iii, 65 p. : ill. ; 28 cm.
Notes
  • "August 2004."
  • Includes bibliographical references (p. 56-57).
Series Statement
VTRC ; 05-R6
VTRC (Series) ; 05-R6
Other Forms
Also available online (Adobe Acrobat Reader required) via the Virginia Transportation Research Council website http://www.virginiadot.org/vtrc/main/index%5Fmain. htm
Logo for Copyright Not EvaluatedCopyright Not Evaluated
Technical Details
  • Access in Virgo Classic

  • LEADER 04084cam a2200457Ia 4500
    001 u4072001
    003 SIRSI
    005 20040929201203.0
    008 040909s2004 vaua bt s000 0 eng d
    027
      
      
    a| FHWA/VTRC 05-R6
    035
      
      
    a| (Sirsi) o56473359
    035
      
      
    a| (OCoLC)56473359
    040
      
      
    a| TDG c| TDG
    043
      
      
    a| n-us-va
    090
      
      
    a| TE228 b| .B43 2004
    100
    1
      
    a| Beacher, Andrew G.
    245
    1
    0
    a| Evaluation of the late merge work zone traffic control strategy / c| Andrew G. Beacher, Michael D. Fontaine, Nicholas J. Garber.
    260
      
      
    a| Charlottesville, Va. : b| Virginia Transportation Research Council, c| 2004.
    300
      
      
    a| iii, 65 p. : b| ill. ; c| 28 cm.
    490
    1
      
    a| VTRC ; v| 05-R6
    500
      
      
    a| "August 2004."
    504
      
      
    a| Includes bibliographical references (p. 56-57).
    513
      
      
    a| Final report.
    520
    3
      
    a| Several alternative lane merge strategies have been proposed in recent years to process vehicles through work zone lane closures more safely and efficiently. Among these is the late merge. With the late merge, drivers are instructed to use all lanes to the merge point and then take turns proceeding through the work zone. Its efficiency has been tested on only a limited basis. The purpose of this project was to determine when, if at all, deployment of the late merge was beneficial. The late merge concept was evaluated by comparing it to the traditional merge using computer simulations and field evaluations. Computer simulations included analysis of 2-to-1, 3-to-1, and 3-to-2 lane closure configurations to determine its impact on throughput and the impact of factors such as free flow speed, demand volume, and percentage of heavy vehicles. Field tests were limited to 2-to-1 lane closures, as recommended by state transportation officials, and examined the impact of treatment type on vehicle throughput, percentage of vehicles in the closed lane, and time in queue. Results of the computer simulations showed the late merge produced a statistically significant increase in throughput volume for only the 3-to-1-lane closure configuration and was beneficial across all factors for this type of closure. For the 2-to-1 and 3-to-2 lane closure configurations, the late merge increased throughput when the percentage of heavy vehicles was large. Field tests showed similar trends with regard to throughput. Although throughput increased, the increase was not statistically significant because of the limited number of heavy vehicles at the site. More drivers were in the closed lane, indicating a response to the late merge signs. Time in queue was also reduced, although the reductions were not statistically significant. The authors conclude that the late merge should be considered for 3-to-1 lane closure configurations but not until a sound methodology for deployment has been developed and tested in the field. For the 2-to-1 and 3-to-2 configurations, the late merge should be implemented only when the percentage of heavy vehicles is at least 20 percent.
    530
      
      
    a| Also available online (Adobe Acrobat Reader required) via the Virginia Transportation Research Council website http://www.virginiadot.org/vtrc/main/index%5Fmain. htm
    536
      
      
    a| Performed by Virginia Tansportation Research Council for Virginia Department of Transportation and U.S. Federal Highway Administration under contract no. 64204
    596
      
      
    a| 2 10
    650
      
    0
    a| Roads x| Maintenance and repair x| Safety measures.
    650
      
    0
    a| Traffic flow.
    700
    1
      
    a| Fontaine, Michael D.
    700
    1
      
    a| Garber, Nicholas J.
    830
      
    0
    a| VTRC (Series) ; v| 05-R6.
    856
    4
    1
    u| http://www.virginiadot.org/vtrc/main/online%5Freports/pdf/05-r6.pdf
    994
      
      
    a| Z0 b| VA@
    710
    2
      
    a| Virginia Transportation Research Council.
    710
    1
      
    a| Virginia. b| Department of Transportation
    710
    1
      
    a| United States. b| Federal Highway Administration.
    999
      
      
    a| TE228 .B43 2004 w| LC i| 4072001-1001 l| STACKS m| SPEC-COLL t| RAREBOOK
    999
      
      
    a| VHRC 3/R 29/61-R6 w| SUDOC i| X004837627 l| DOC-VA m| ALDERMAN t| DOCUMENT

Availability

Google Preview

Read Online

Library Location Map Availability Call Number
Alderman Virginia Documents (3 Old) Map Available
Special Collections Special Collections N/A Available