Item Details

Print View

Highway Infrastructure [electronic resource]: Perceptions of Stakeholders on Approaches to Reduce Highway Project Completion Time : Report to the Ranking Minority Member, Committee on Environment and Public Works, U.S. Senate

United States. General Accounting Office; United States Congress Senate Committee on Environment and Public Works
Format
EBook; Book; Government Document; Online
Published
[Washington, D.C.] : U.S. General Accounting Office, [2003]
Language
English
Variant Title
Perceptions of stakeholders on approaches to reduce highway project completion time
Reducing highway project completion time
SuDoc Number
GA 1.13:GAO-03-398
Description
Mode of access: Internet from GAO web site. Address as of 8/13/03: http://www.gao.gov/new.items/d03398.pdf; current access available via PURL.
Notes
  • Title from title screen (viewed on Aug. 13, 2003).
  • "April 2003."
  • Paper version available from: General Accounting Office, 441 G St., NW, Rm. LM, Washington, D.C. 20548.
  • Includes bibliographical references.
Copyright Not EvaluatedCopyright Not Evaluated
Technical Details
  • Access in Virgo Classic
  • Staff View

    LEADER 02372nam a2200469 a 4500
    001 u3996234
    003 SIRSI
    005 20031120114913.0
    006 m d f
    007 cr mn-
    008 030813s2003 dcu sb f000 0 eng c
    035
      
      
    a| (Sirsi) ocm52842310
    035
      
      
    a| (OCoLC)52842310
    037
      
      
    b| GAO (202)512-6000 (voice); (202)512-6061 (Fax); (202)512-2537 (TDD) f| paper copy
    040
      
      
    a| MDT c| MDT d| GPO d| MvI
    042
      
      
    a| pcc
    043
      
      
    a| n-us---
    074
      
      
    a| 0546-D (online)
    088
      
      
    a| GAO-03-398
    086
    0
      
    a| GA 1.13:GAO-03-398
    110
    1
      
    a| United States. b| General Accounting Office.
    245
    1
    0
    a| Highway infrastructure h| [electronic resource] : b| perceptions of stakeholders on approaches to reduce highway project completion time : report to the ranking minority member, Committee on Environment and Public Works, U.S. Senate.
    246
    3
    0
    a| Perceptions of stakeholders on approaches to reduce highway project completion time
    246
    1
    7
    a| Reducing highway project completion time
    260
      
      
    a| [Washington, D.C.] : b| U.S. General Accounting Office, c| [2003]
    538
      
      
    a| Mode of access: Internet from GAO web site. Address as of 8/13/03: http://www.gao.gov/new.items/d03398.pdf; current access available via PURL.
    500
      
      
    a| Title from title screen (viewed on Aug. 13, 2003).
    500
      
      
    a| "April 2003."
    500
      
      
    a| Paper version available from: General Accounting Office, 441 G St., NW, Rm. LM, Washington, D.C. 20548.
    504
      
      
    a| Includes bibliographical references.
    596
      
      
    a| 1
    650
      
    0
    a| Roads x| Design and construction.
    650
      
    0
    a| Construction industry x| Production control z| United States.
    650
      
    0
    a| Construction industry x| Government policy z| United States.
    655
      
    7
    a| Internet resource. 2| local
    776
    0
      
    t| Highway infrastructure : perceptions of stakeholders on approaches to reduced highway project completion time h| ii, 33 p. w| (OCoLC)52615711
    776
    0
      
    t| Highway infrastructure : perceptions of stakeholders on approaches to reduced highway project completion time h| 1 microfiche w| (OCoLC)52499357
    710
    1
      
    a| United States. b| Congress. b| Senate. b| Committee on Environment and Public Works.
    856
    4
    0
    u| http://purl.access.gpo.gov/GPO/LPS36545
    999
      
      
    a| GA 1.13:GAO-03-398 w| SUDOC i| 3996234-1001 l| INTERNET m| UVA-LIB t| INTERNET
▾See more
▴See less

Availability

Google Preview

Google Books Preview

Read Online