Item Details

Print View

National Ignition Facility: Management and Oversight Failures Caused Major Cost Overruns and Schedule Delays : Report to the Committee on Science, House of Representatives

United States General Accounting Office
Format
EBook; Book; Government Document; Online
Published
Washington, D.C. (P.O. Box 37050, Washington, D.C. 20013) : The Office, [2000]
Language
English
Variant Title
Management and oversight failures caused major cost overruns and schedule delays
SuDoc Number
GA 1.13:RCED-00-141
Description
45 p. : ill. ; 28 cm.
Notes
  • Cover title.
  • "August 2000."
  • "GAO/RCED-00-141."
  • "B-284392"--P. 3.
  • Includes bibliographical references.
Other Forms
Available via Internet from the GPO Access Web site. Address as of 2-1-01: http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi ?dbname=gao&docid=f:rc00141.pdf; current access is available via PURL.
Copyright Not EvaluatedCopyright Not Evaluated
Technical Details
  • Access in Virgo Classic
  • Staff View

    LEADER 01950nam a2200421 a 4500
    001 u3700359
    003 SIRSI
    005 20010205081435.0
    008 010112s2000 dcua b f000 0 eng c
    035
      
      
    a| (Sirsi) ocm45711266
    035
      
      
    a| (OCoLC)45711266
    037
      
      
    a| 576411 b| GAO (202) 512-6000 (Voice); (202) 512-6061 (Fax) f| paper copy
    040
      
      
    a| IQU c| IQU d| GPO d| DLC d| MvI
    042
      
      
    a| pcc
    043
      
      
    a| n-us---
    074
      
      
    a| 0546-D (online)
    088
      
      
    a| GAO/RCED-00-141
    088
      
      
    a| B-284392
    086
    0
      
    a| GA 1.13:RCED-00-141
    110
    1
      
    a| United States. b| General Accounting Office.
    245
    1
    0
    a| National Ignition Facility : b| management and oversight failures caused major cost overruns and schedule delays : report to the Committee on Science, House of Representatives / c| United States General Accounting Office.
    246
    3
    0
    a| Management and oversight failures caused major cost overruns and schedule delays
    260
      
      
    a| Washington, D.C. (P.O. Box 37050, Washington, D.C. 20013) : b| The Office, c| [2000]
    300
      
      
    a| 45 p. : b| ill. ; c| 28 cm.
    500
      
      
    a| Cover title.
    500
      
      
    a| "August 2000."
    504
      
      
    a| Includes bibliographical references.
    500
      
      
    a| "GAO/RCED-00-141."
    500
      
      
    a| "B-284392"--P. 3.
    530
      
      
    a| Available via Internet from the GPO Access Web site. Address as of 2-1-01: http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi ?dbname=gao&docid=f:rc00141.pdf; current access is available via PURL.
    596
      
      
    a| 1
    610
    1
    0
    a| United States. b| Department of Energy. b| National Ignition Facility x| Appropriations and expenditures.
    610
    1
    0
    a| United States. b| Department of Energy. b| National Ignition Facility x| Management.
    650
      
    0
    a| Nuclear facilities z| United States x| Costs.
    856
    4
    0
    u| http://purl.access.gpo.gov/GPO/LPS8847 z| Adobe Acrobat Reader required
    999
      
      
    a| GA 1.13:RCED-00-141 w| SUDOC i| 3700359-1001 l| INTERNET m| UVA-LIB t| INTERNET
▾See more
▴See less

Availability

Google Preview

Google Books Preview

Read Online