Item Details

Hoover Power Plant Amendments of 1992: Hearing Before the Subcommittee on Water, Power, and Offshore Energy Resources of the Committee on Interior and Insular Affairs, House of Representatives, One Hundred Second Congress, Second Session, on H.R. 4126, to Require the Western Area Power Administration to Amend All Long-Term Power Service Contracts to Include Provisions Requiring the Implementation of Integrated Resource Planning, Hearing Held in Washington, DC, March 12 1992

United States. Congress. House. Committee on Interior and Insular Affairs. Subcommittee on Water, Power, and Offshore Energy Resources
Format
Book; Government Document
Published
Washington : U.S. G.P.O. : For sale by the U.S. G.P.O., Supt. of Docs., Congressional Sales Office, 1992.
Language
English
ISBN
0160396530
SuDoc Number
Y 4.IN 8/14:102-32
Description
iv, 595 p. : ill. ; 24 cm.
Notes
  • "Serial no. 102-32."
  • Includes bibliographical references.
Technical Details
  • Access in Virgo Classic

  • LEADER 01974nam a2200397Ia 4500
    001 u3406150
    003 SIRSI
    008 930303s1992 dcua b f000 0 eng d
    020
      
      
    a| 0160396530
    035
      
      
    a| (Sirsi) b2779006
    035
      
      
    a| b2779006
    035
      
      
    a| (OCoLC)27658096
    040
      
      
    a| GPO c| GPO
    043
      
      
    a| n-us-az a| n-us-nv a| n-us---
    049
      
      
    a| VALL
    074
      
      
    a| 1023-A
    074
      
      
    a| 1023-B (MF)
    086
    0
      
    a| Y 4.IN 8/14:102-32
    110
    1
      
    a| United States. b| Congress. b| House. b| Committee on Interior and Insular Affairs. b| Subcommittee on Water, Power, and Offshore Energy Resources.
    245
    1
    0
    a| Hoover Power Plant amendments of 1992 : b| hearing before the Subcommittee on Water, Power, and Offshore Energy Resources of the Committee on Interior and Insular Affairs, House of Representatives, One Hundred Second Congress, second session, on H.R. 4126, to require the Western Area Power Administration to amend all long-term power service contracts to include provisions requiring the implementation of integrated resource planning, hearing held in Washington, DC, March 12 1992.
    260
      
      
    a| Washington : b| U.S. G.P.O. : b| For sale by the U.S. G.P.O., Supt. of Docs., Congressional Sales Office, c| 1992.
    300
      
      
    a| iv, 595 p. : b| ill. ; c| 24 cm.
    500
      
      
    a| "Serial no. 102-32."
    504
      
      
    a| Includes bibliographical references.
    596
      
      
    a| 17
    610
    1
    0
    a| United States. b| Western Area Power Administration x| Procurement.
    650
      
    0
    a| Hydroelectric power plants x| Law and legislation z| United States.
    650
      
    0
    a| Water resources development x| Law and legislation z| United States.
    650
      
    0
    a| Hydroelectric power plants z| Hoover Dam (Ariz. and Nev.)
    651
      
    0
    a| Hoover Dam (Ariz. and Nev.)
    941
      
      
    a| 03-11-93 b| 06-14-96 c| 3
    948
      
      
    a| 03/11/93 b| 06/14/96 c| 03/11/93
    999
      
      
    a| Y 4.IN 8/14:102-32 w| SUDOC i| 35007000411961 l| LAW2-DOCS m| LAW t| DOCUMENT

Availability

Google Preview

Library Location Map Availability Call Number
Law 2nd Floor Documents Map Available