Item Details

Print View

Navy Contract: AOE 6 Shipbuilding Claims Settled But More Delays and Cost Growth Likely : Report to Congressional Committees

United States General Accounting Office
Format
Book; Government Document
Published
Washington, D.C. : The Office ; Gaithersburg, MD (P.O. Box 6015, Gaithersburg 20884-6015) : The Office [distributor, 1993]
Language
English
Related Title
AOE 6 shipbuilding claims settled but more delays and cost growth likely.
SuDoc Number
GA 1.13:NSIAD-93-298
Description
6 p. ; 28 cm.
Notes
  • Cover title.
  • "September 1993."
  • "GAO/NSIAD-93-298."
  • "B-251748"--P. [1]
Technical Details
  • Access in Virgo Classic
  • Staff View

    LEADER 01492nam a2200385Ia 4500
    001 u3346170
    003 SIRSI
    008 931019s1993 dcu f000 0 eng d
    035
      
      
    a| (Sirsi) b3153940
    035
      
      
    a| b3153940
    035
      
      
    a| (OCoLC)29046601
    040
      
      
    a| GAO c| GAO
    043
      
      
    a| n-us---
    049
      
      
    a| VALO
    086
    0
      
    a| GA 1.13:NSIAD-93-298
    110
    1
      
    a| United States. b| General Accounting Office.
    245
    1
    0
    a| Navy contract : b| AOE 6 shipbuilding claims settled but more delays and cost growth likely : report to Congressional committees / c| United States General Accounting Office.
    260
      
      
    a| Washington, D.C. : b| The Office ; a| Gaithersburg, MD (P.O. Box 6015, Gaithersburg 20884-6015) : b| The Office [distributor, c| 1993]
    300
      
      
    a| 6 p. ; c| 28 cm.
    500
      
      
    a| Cover title.
    500
      
      
    a| "September 1993."
    500
      
      
    a| "GAO/NSIAD-93-298."
    500
      
      
    a| "B-251748"--P. [1]
    596
      
      
    a| 17
    610
    1
    0
    a| United States. b| Navy x| Procurement x| Evaluation.
    610
    1
    0
    a| United States. b| Navy x| Auditing.
    610
    2
    0
    a| National Steel and Shipbuilding Company (San Diego, Calif.)
    650
      
    0
    a| Shipbuilding z| United States x| Costs.
    740
    0
      
    a| AOE 6 shipbuilding claims settled but more delays and cost growth likely.
    941
      
      
    a| 03-08-96 b| 09-23-99 c| 4
    948
      
      
    a| 03/08/96 b| 09/23/99 c| 03/08/96
    999
      
      
    a| GA 1.13:NSIAD-93-298 w| SUDOC i| 35007002297350 l| LAW2-DOCS m| LAW t| DOCUMENT
▾See more
▴See less

Availability

Google Preview

Google Books Preview
Library Location Map Availability Call Number
Law 2nd Floor Documents Map Available