Item Details

Print View

A Preliminary Evaluation of the Rock Mass Disturbance Resulting From Shaft, Tunnel, or Borehole Excavation: Technical Report

P.C. Kelsall, J.B. Case, C.R. Chabannes
Format
Book; Government Document
Published
Columbus, Ohio : Office of Nuclear Waste Isolation, Battelle Project Management Division ; Springfield, VA : Available from National Technical Information Service, [1982]
Language
English
SuDoc Number
E 1.28:ONWI-411
Description
1 v. (various pagings) : ill. ; 28 cm.
Notes
  • "Prepared by D'Appolonia Consulting Engineers, Inc. under subcontract E512-03000 with Battelle Project Management Division, Office of Nuclear Waste Isolation under contract no. DE-AC06-76-RLO1830-ONWI with the U.S. Department of Energy."
  • "November 1982."
  • "ONWI-411."
  • Bibliography: p. 125-132.
Technical Details
  • Access in Virgo Classic
  • Staff View

Availability

Library Location Map Availability Call Number
Alderman 3rd Floor East Reading Room N/A Available Non-Circ.