Item Details

Print View

H.R. 13879 and H.R. 5845, to Authorize the Secretary of the Interior to Construct, Operate, and Maintain the Nueces River Project, Texas [electronic resource]: Choke Canyon Site

United States. Congress. House. Committee on Interior and Insular Affairs. Subcommittee on Water and Power Resources
Format
Online; EBook; Government Document
Published
[S.l] : [s.n.], 1974.
Language
English
Related Title
ProQuest U.S. Congressional Digital Hearings Collection
Series
ProQuest U.S. Congressional Hearings Digital Collection
Summary
Hearing before the Subcom on Water and Power Resources to consider H.R. 13879 and H.R. 5845, both to authorize the Secretary of Interior to construct, operate, and maintain the Nueces River Project, Tex. Project includes construction of the Choke Canyon Dam and Reservoir on the Frio River, Tex., and outdoor recreation and sportfishing facilities. The City of Corpus Christi, Tex., is to contribute to project's cost and to operate and maintain subsequently developed water supply facilities.
Includes.
Description
125 p.
System requirements: PDF reader software.
Notes
  • Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection (last viewed Nov. 2009) Reuse except for individual research requires license from ProQuest, LLC.
  • Access to the Congressional Hearings Digital Collection is restricted by license to users on UVA's network. This document may also be available in print or microform at either UVa's Alderman or Law Libraries.
  • CIS No. HRG-1974-IIA-0357
  • Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection (last viewed Mar. 2011). Reuse except for individual research requires license from ProQuest, LLC.
Copyright Not EvaluatedCopyright Not Evaluated
Technical Details
  • Staff View

    LEADER 02562nam a22003011a 4500
    001 cis2007530716
    006 m d f
    007 cr bn mmmapmmp
    008 110316s1974 dcu s f000 0 eng d
    110
    1
      
    a| United States. b| Congress. b| House. b| Committee on Interior and Insular Affairs. b| Subcommittee on Water and Power Resources.
    245
    1
    0
    a| H.R. 13879 and H.R. 5845, To Authorize the Secretary of The Interior To Construct, Operate, and Maintain the Nueces River Project, Texas h| [electronic resource] : b| Choke Canyon Site.
    260
      
      
    a| [S.l] : b| [s.n.], c| 1974.
    300
      
      
    a| 125 p.
    500
      
      
    a| Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection (last viewed Nov. 2009) Reuse except for individual research requires license from ProQuest, LLC.
    500
      
      
    a| Access to the Congressional Hearings Digital Collection is restricted by license to users on UVA's network. This document may also be available in print or microform at either UVa's Alderman or Law Libraries.
    500
      
      
    a| CIS No. HRG-1974-IIA-0357
    500
      
      
    a| Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection (last viewed Mar. 2011). Reuse except for individual research requires license from ProQuest, LLC.
    520
      
      
    a| Hearing before the Subcom on Water and Power Resources to consider H.R. 13879 and H.R. 5845, both to authorize the Secretary of Interior to construct, operate, and maintain the Nueces River Project, Tex. Project includes construction of the Choke Canyon Dam and Reservoir on the Frio River, Tex., and outdoor recreation and sportfishing facilities. The City of Corpus Christi, Tex., is to contribute to project's cost and to operate and maintain subsequently developed water supply facilities.
    520
      
      
    a| Includes.
    538
      
      
    a| System requirements: PDF reader software.
    650
      
    0
    a| Recreation areas.
    650
      
    0
    a| Water resources development.
    650
      
    0
    a| Water-supply.
    776
    0
    8
    a| United States.Congress.House.Committee on Interior and Insular Affairs.Subcommittee on Water and Power Resources. t| H.R. 13879 and H.R. 5845, To Authorize the Secretary of The Interior To Construct, Operate, and Maintain the Nueces River Project, Texas. o| 93 HIni-T.319
    830
      
    0
    a| ProQuest U.S. Congressional Hearings Digital Collection.
    856
    4
    0
    u| http://proxy.its.virginia.edu/login?url=http://congressional.proquest.com/congcomp/getdoc?HEARING-ID=HRG-1974-IIA-0357 y| Electronic resource (PDF)
    040
      
      
    a| UMI c| UMI
    730
    0
      
    a| ProQuest U.S. Congressional Digital Hearings Collection
▾See more
▴See less

Availability

Read Online