Item Details

Print View

S. 1529 and H.R. 6781, to Authorize the Secretary of the Interior to Construct, Operate, and Maintain a Replacement Dam for the Existing American Falls Dam of the Upper Snake River Basin Project, Idaho [electronic resource]: H.R. 6782, to Authorize the Secretary of the Interior to Enter Into Agreements With Non-Federal Agencies for the Replacement of the Existing American Falls Dam, Upper Snake River Project, Idaho

United States. Congress. House. Committee on Interior and Insular Affairs. Subcommittee on Water and Power Resources
Format
Online; EBook; Government Document
Published
[S.l] : [s.n.], 1973.
Language
English
Related Title
ProQuest U.S. Congressional Digital Hearings Collection
Series
ProQuest U.S. Congressional Hearings Digital Collection
Summary
Hearing before the Subcom on Water and Power Resources to consider the following bills.
Includes transcript (p. 61-63) of Subcom Nov. 15, 1973, markup session on S. 1529. Amended bill was favorably reported.
Description
125 p.
System requirements: PDF reader software.
Notes
  • Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection (last viewed Nov. 2009) Reuse except for individual research requires license from ProQuest, LLC.
  • Access to the Congressional Hearings Digital Collection is restricted by license to users on UVA's network. This document may also be available in print or microform at either UVa's Alderman or Law Libraries.
  • CIS No. HRG-1973-IIA-0188
  • Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection (last viewed Mar. 2011). Reuse except for individual research requires license from ProQuest, LLC.
Copyright Not EvaluatedCopyright Not Evaluated
Technical Details
  • Staff View

    LEADER 02563nam a22003011a 4500
    001 cis2007530124
    006 m d f
    007 cr bn mmmapmmp
    008 110316s1973 dcu s f000 0 eng d
    110
    1
      
    a| United States. b| Congress. b| House. b| Committee on Interior and Insular Affairs. b| Subcommittee on Water and Power Resources.
    245
    1
    0
    a| S. 1529 and H.R. 6781, To Authorize the Secretary of the Interior To Construct, Operate, and Maintain a Replacement Dam for the Existing American Falls Dam of the Upper Snake River Basin Project, Idaho h| [electronic resource] : b| H.R. 6782, To Authorize the Secretary of the Interior To Enter into Agreements with Non-Federal Agencies for the Replacement of the Existing American Falls Dam, Upper Snake River Project, Idaho.
    260
      
      
    a| [S.l] : b| [s.n.], c| 1973.
    300
      
      
    a| 125 p.
    500
      
      
    a| Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection (last viewed Nov. 2009) Reuse except for individual research requires license from ProQuest, LLC.
    500
      
      
    a| Access to the Congressional Hearings Digital Collection is restricted by license to users on UVA's network. This document may also be available in print or microform at either UVa's Alderman or Law Libraries.
    500
      
      
    a| CIS No. HRG-1973-IIA-0188
    500
      
      
    a| Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection (last viewed Mar. 2011). Reuse except for individual research requires license from ProQuest, LLC.
    520
      
      
    a| Hearing before the Subcom on Water and Power Resources to consider the following bills.
    520
      
      
    a| Includes transcript (p. 61-63) of Subcom Nov. 15, 1973, markup session on S. 1529. Amended bill was favorably reported.
    538
      
      
    a| System requirements: PDF reader software.
    610
    1
    0
    a| United States. b| Congress x| Committees.
    650
      
    0
    a| Dams.
    651
      
    0
    a| Idaho.
    776
    0
    8
    a| United States.Congress.House.Committee on Interior and Insular Affairs.Subcommittee on Water and Power Resources. t| S. 1529 and H.R. 6781, To Authorize the Secretary of the Interior To Construct, Operate, and Maintain a Replacement Dam for the Existing American Falls Dam of the Upper Snake River Basin Project, Idaho;. o| 93 HIni-T.153
    830
      
    0
    a| ProQuest U.S. Congressional Hearings Digital Collection.
    856
    4
    0
    u| http://proxy.its.virginia.edu/login?url=http://congressional.proquest.com/congcomp/getdoc?HEARING-ID=HRG-1973-IIA-0188 y| Electronic resource (PDF)
    040
      
      
    a| UMI c| UMI
    730
    0
      
    a| ProQuest U.S. Congressional Digital Hearings Collection
▾See more
▴See less

Availability

Read Online