Item Details

Print View

Proposed Arrangements for Electric Generating Facilities at Hanford New Production Reactor [electronic resource]: Hearings Before the United States Joint Committee on Atomic Energy, Eighty-Seventh Congress, Second Session, on Sept. 27, 1962

United States. Congress. Joint Committee on Atomic Energy
Format
Online; EBook; Government Document
Published
Washington : U.S. G.P.O., 1962.
Language
English
Series
ProQuest U.S. Congressional Hearings Digital Collection
SuDoc Number
Y 4.At 7/2:H 19/5
Summary
Reviews proposed contract between AEC, Bonneville Power Administration and Washington State Public Power System for construction and operation of the Hanford nuclear reactor.
Description
iii, 44 p. ; cm.
System requirements: PDF reader software.
Notes
  • Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection (last viewed Nov. 2009) Reuse except for individual research requires license from ProQuest, LLC.
  • Access to the Congressional Hearings Digital Collection is restricted by license to users on UVA's network. This document may also be available in print or microform at either UVa's Alderman or Law Libraries.
  • CIS No. HRG-1962-AEJ-0012
  • Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection. Reuse except for individual research requires license from ProQuest, LLC.
Reproduction Notes
Electronic reproduction. [Bethesda, Md.] : ProQuest, 2004. digital, PDF file. ProQuest U.S. Congressional Hearings Digital Collection. Mode of access: World Wide Web via ProQuest website.
Copyright Not EvaluatedCopyright Not Evaluated
Technical Details
  • Staff View

    LEADER 02616nam a22003131a 4500
    001 cis2007429625
    006 m d f
    007 cr bn mmmapmmp
    008 090623s1962 dcu s f000 0 eng d
    086
    0
      
    a| Y 4.At 7/2:H 19/5
    110
    1
      
    a| United States. b| Congress. b| Joint Committee on Atomic Energy.
    245
    1
    0
    a| Proposed Arrangements for Electric Generating Facilities at Hanford New Production Reactor h| [electronic resource] : b| hearings before the United States Joint Committee on Atomic Energy, Eighty-Seventh Congress, second session, on Sept. 27, 1962.
    260
      
      
    a| Washington : b| U.S. G.P.O., c| 1962.
    300
      
      
    a| iii, 44 p. ; c| cm.
    500
      
      
    a| Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection (last viewed Nov. 2009) Reuse except for individual research requires license from ProQuest, LLC.
    500
      
      
    a| Access to the Congressional Hearings Digital Collection is restricted by license to users on UVA's network. This document may also be available in print or microform at either UVa's Alderman or Law Libraries.
    500
      
      
    a| CIS No. HRG-1962-AEJ-0012
    500
      
      
    a| Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection. Reuse except for individual research requires license from ProQuest, LLC.
    520
      
      
    a| Reviews proposed contract between AEC, Bonneville Power Administration and Washington State Public Power System for construction and operation of the Hanford nuclear reactor.
    533
      
      
    a| Electronic reproduction. b| [Bethesda, Md.] : c| ProQuest, d| 2004. e| digital, PDF file. n| ProQuest U.S. Congressional Hearings Digital Collection. n| Mode of access: World Wide Web via ProQuest website.
    538
      
      
    a| System requirements: PDF reader software.
    650
      
    0
    a| Nuclear reactors z| Hanford (Wash.) x| Design and construction.
    650
      
    0
    a| Electric power-plants z| Hanford (Wash.)
    776
    0
    8
    i| Print version: a| United States. Congress. Joint Committee on Atomic Energy. t| Proposed Arrangements for Electric Generating Facilities at Hanford New Production Reactor
    776
    0
    8
    i| Microfiche version: a| United States. Congress. Joint Committee on Atomic Energy. t| Proposed Arrangements for Electric Generating Facilities at Hanford New Production Reactor. d| [Bethesda, Md.] : ProQuest,[2004] o| CIS Hrgs MF Gp 3--(87) S1521-3 w| (ProQuest)cis10703668
    830
      
    0
    a| ProQuest U.S. Congressional Hearings Digital Collection.
    856
    4
    0
    u| http://proxy.its.virginia.edu/login?url=http://congressional.proquest.com/congcomp/getdoc?HEARING-ID=HRG-1962-AEJ-0012 y| Electronic resource (PDF)
    998
      
      
    a| cis10703668
    040
      
      
    a| UMI c| UMI
▾See more
▴See less

Availability

Read Online