Item Details

Print View

Cougar Dam Hydroelectric Project [electronic resource]: Hearings Before the United States House Committee on Public Works, Subcommittee on Flood Control, Eighty-Third Congress, Second Session, on Mar. 19, Apr. 28, 1954

United States. Congress. House. Committee on Public Works. Subcommittee on Flood Control
Format
Online; EBook; Government Document
Published
Washington : U.S. G.P.O., 1954.
Language
English
Series
ProQuest U.S. Congressional Hearings Digital Collection
SuDoc Number
Y 4.P 96/11:83/15
Summary
Committee Serial No. 83-15. Considers legislation to modify the general plan for additional hydroelectric power development of the Columbia River Basin and to construct, operate, and maintain the Cougar Dam and Reservoir on the south fork of McKenzie River, Oreg., with participation for power by Eugene, Oreg.
Considers (83) H.R. 4541, (83) H.R. 7815.
Description
iii, 96 p. ; cm.
System requirements: PDF reader software.
Notes
  • Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection (last viewed Nov. 2009) Reuse except for individual research requires license from ProQuest, LLC.
  • Access to the Congressional Hearings Digital Collection is restricted by license to users on UVA's network. This document may also be available in print or microform at either UVa's Alderman or Law Libraries.
  • CIS No. HRG-1954-PWH-0005
  • Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection. Reuse except for individual research requires license from ProQuest, LLC.
Reproduction Notes
Electronic reproduction. [Bethesda, Md.] : ProQuest, 2004. digital, PDF file. ProQuest U.S. Congressional Hearings Digital Collection. Mode of access: World Wide Web via ProQuest website.
Copyright Not EvaluatedCopyright Not Evaluated
Technical Details
  • Staff View

    LEADER 02669nam a22003131a 4500
    001 cis2007422034
    006 m d f
    007 cr bn mmmapmmp
    008 090617s1954 dcu s f000 0 eng d
    086
    0
      
    a| Y 4.P 96/11:83/15
    110
    1
      
    a| United States. b| Congress. b| House. b| Committee on Public Works. b| Subcommittee on Flood Control.
    245
    1
    0
    a| Cougar Dam Hydroelectric Project h| [electronic resource] : b| hearings before the United States House Committee on Public Works, Subcommittee on Flood Control, Eighty-Third Congress, second session, on Mar. 19, Apr. 28, 1954.
    260
      
      
    a| Washington : b| U.S. G.P.O., c| 1954.
    300
      
      
    a| iii, 96 p. ; c| cm.
    500
      
      
    a| Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection (last viewed Nov. 2009) Reuse except for individual research requires license from ProQuest, LLC.
    500
      
      
    a| Access to the Congressional Hearings Digital Collection is restricted by license to users on UVA's network. This document may also be available in print or microform at either UVa's Alderman or Law Libraries.
    500
      
      
    a| CIS No. HRG-1954-PWH-0005
    500
      
      
    a| Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection. Reuse except for individual research requires license from ProQuest, LLC.
    520
      
      
    a| Committee Serial No. 83-15. Considers legislation to modify the general plan for additional hydroelectric power development of the Columbia River Basin and to construct, operate, and maintain the Cougar Dam and Reservoir on the south fork of McKenzie River, Oreg., with participation for power by Eugene, Oreg.
    520
      
      
    a| Considers (83) H.R. 4541, (83) H.R. 7815.
    533
      
      
    a| Electronic reproduction. b| [Bethesda, Md.] : c| ProQuest, d| 2004. e| digital, PDF file. n| ProQuest U.S. Congressional Hearings Digital Collection. n| Mode of access: World Wide Web via ProQuest website.
    538
      
      
    a| System requirements: PDF reader software.
    651
      
    0
    a| Cougar Dam (Or.)
    776
    0
    8
    i| Print version: a| United States. Congress. House. Committee on Public Works. Subcommittee on Flood Control. t| Cougar Dam Hydroelectric Project
    776
    0
    8
    i| Microfiche version: a| United States. Congress. House. Committee on Public Works. Subcommittee on Flood Control. t| Cougar Dam Hydroelectric Project. d| [Bethesda, Md.] : ProQuest,[2004] o| CIS Hrgs MF Gp 3--(83) H1465-5 w| (ProQuest)cis10600490
    830
      
    0
    a| ProQuest U.S. Congressional Hearings Digital Collection.
    856
    4
    0
    u| http://proxy.its.virginia.edu/login?url=http://congressional.proquest.com/congcomp/getdoc?HEARING-ID=HRG-1954-PWH-0005 y| Electronic resource (PDF)
    998
      
      
    a| cis10600490
    040
      
      
    a| UMI c| UMI
▾See more
▴See less

Availability

Read Online